Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Topics - NeilB4Theking

Pages: [1]
1
Improvement Ideas / Percentage complete based on checked sub tasks
« on: July 28, 2011, 06:38:48 pm »
just downloaded your program for Mac and loving it already. so simple and yet so powerful.

my wife who is a professional photography (creative type) and thinks visually. she would love to use it to track her jobs. she created a map starting with WEDDINGS then attached her CLIENTS (as topics) and then tasks and subtasks she needs to do to complete the job.

She would love to use check boxes on each task and subtask and have the program automatically tell her the percentage complete (based on the checks) at each task and an overall percentage complete at the CLIENT (topic level).

At the moment she can do this but she has to manually type in the % complete at each task/subtask.


Pages: [1]